Chapter 8: Welding Inspection & Visual Acceptance Criteria
📘 8.1 Importance of Welding Inspection in QA/QC
Welding inspection ensures that welds meet:
Code requirements (ASME, AWS, ISO)
Client specificationsSafety standards
🛠️ Inspection helps avoid structural failure, leaks, explosions, and rework.
🔍 8.2 Types of Welding Inspection
Stage | Type | Purpose |
---|---|---|
Before Welding | Fit-up, alignment, material check | Ensure preparation is correct |
During Welding | Arc control, interpass cleaning, parameter verification | Prevent defects from forming |
After Welding | Visual, NDT (UT, RT, MPI, DPI) | Confirm weld integrity |
👁️ 8.3 Visual Inspection (VT) – First Line of QA
Conducted before any NDT
Checks include:
Cracks, undercut, porosity
Weld size and shape
Slag inclusion or spatter
Root pass visibility
Tools Used:
-
Weld gauges
-
Flashlight
-
Mirror
-
Magnifier
📌 Standards: AWS D1.1, ASME Section V, ISO 5817
📐 8.4 Visual Acceptance Criteria (Common)
Defect | Maximum Allowance (Typical) |
---|---|
Undercut | ≤ 1/32 inch (0.8 mm) |
Porosity | Limited by size and number |
Incomplete fusion | Not allowed |
Excess weld reinforcement | ≤ 3 mm |
Slag inclusion | Not allowed |
Cracks | Not allowed under any code |
📦 8.5 Weld Defects – Classification
Type | Examples |
---|---|
Surface Defects | Cracks, spatter, undercut |
Internal Defects | Lack of fusion, porosity, slag |
Dimensional Defects | Misalignment, excessive root gap |
🛠️ 8.6 Industrial Practice – Visual Weld Log
Example: Boiler Fabrication Shop
-
Each weld joint logged with:
Welder ID
WPS No.Date/time
Fit-up & root pass photo
Visual check remarks
Inspector signature
🧪 8.7 What if Welds Fail Visual Inspection?
Minor Defect → Repaired as per weld repair procedureMajor Defect → Joint cut out and rewelded with documentation
📌 All repairs must be tracked in a Weld Repair Log.
🏭 8.8 Field Example: Storage Tank Welding
Scenario: Storage tank bottom weld showed porosity during VT.
Weld rejectedJoint marked, cut, and rewelded
Inspector logged defect and repair
Re-inspected before continuing work
👉 Saved from future leak risk and inspection hold from client.
📜 8.9 Documentation Checklist for Welding Inspection
Visual Inspection Reports (VT)Weld Maps
Repair Logs
Welder IDs and WPQ certificates
WPS & PQR copies
Calibration logs of measuring tools
🔄 8.10 Integration with NDT
Visual inspection is always:
First step before RT, UT, DPIRequired even if NDT passes
Used to detect surface issues that RT/UT may miss
🔑 8.11 Summary
Visual inspection is a non-negotiable part of QA/QC
Follows code-based acceptance criteriaSaves cost and rework by detecting early issues
Requires trained personnel and documented process
Quiz: Welding Inspection & Visual Standards
Q1. Which of the following is the first step in the welding inspection process?
A) Radiographic Testing
B) Ultrasonic Testing
C) Visual Inspection
D) Heat Treatment
🟩 Correct Answer: C
Q2. Which weld defect is generally not allowed under any welding code?
A) Spatter
B) Undercut
C) Porosity
D) Crack
🟩 Correct Answer: D
Q3. Visual inspection should be done:
A) Only after welding is completed
B) Before, during, and after welding
C) Only during welding
D) Only when instructed by the client
🟩 Correct Answer: B
Q4. Which tool is not commonly used in visual inspection of welds?
A) Weld gauge
B) Magnifier
C) Flashlight
D) Voltmeter
🟩 Correct Answer: D
Q5. Which standard is commonly used for visual inspection in structural welding?
A) ASME Section II
B) AWS D1.1
C) API 650
D) ISO 31000
🟩 Correct Answer: B
Q6. What is the typical maximum allowable undercut in a weld?
A) 5 mm
B) 0.5 mm
C) 1/32 inch (≈0.8 mm)
D) 3 mm
🟩 Correct Answer: C
Q7. Which of the following is considered a dimensional defect in welding?
A) Crack
B) Slag inclusion
C) Misalignment
D) Porosity
🟩 Correct Answer: C
Q8. If a weld fails visual inspection due to porosity, what is the typical next step?
A) Accept as it is
B) Ignore the defect
C) Repair the weld as per procedure
D) Start the entire project again
🟩 Correct Answer: C
Q9. A Weld Visual Log typically includes:
A) Project budget
B) Painting specification
C) Welder ID, joint info, inspection result
D) Only welder's salary
🟩 Correct Answer: C
Q10. Visual inspection is required even if:
A) NDT reports are already accepted
B) The client agrees to skip it
C) The welder is certified
D) Welds look okay from a distance
🟩 Correct Answer: A