🏠 A. HVAC Design for a 3BHK Residential House
🔹 1. Basic Assumptions:
Room | Size (in ft) | Occupants | Orientation | Windows |
---|---|---|---|---|
Bedroom 1 | 12 × 12 × 10 | 2 | West | 1 |
Bedroom 2 | 12 × 14 × 10 | 2 | South | 1 |
Bedroom 3 | 10 × 12 × 10 | 1 | North | 1 |
Living Room | 14 × 16 × 10 | 4 | East | 2 |
Kitchen | 10 × 10 × 10 | 1 | East | 1 |
🔹 2. Load Calculation
Use Manual J method for residential load:
✅ Formula:
Rough Estimate:
(People, Lights, Appliances): ~3,000 BTU/hr
👉 Total Cooling Load ≈ 30,000 BTU/hr
(= 2.5 Tons)
🔹 3. Equipment Selection
Room Type | Equipment |
---|---|
Bedrooms | 1 Ton Split AC each |
Living + Dining | 1.5 Ton Split AC |
Kitchen | Exhaust fan, cross-ventilation |
Total Units:
-
3 × 1 Ton + 1.5 Ton = 4.5 Tons of Cooling
🔹 4. Duct Design Layout (Optional - for Central AC)
For ducted AC system (instead of splits):
Use flexible ducts or rectangular sheet metal ducts.
Maintain air velocity = 700–900 FPM.Use supply diffusers in the center of rooms, returns at wall level.
Basic layout:
🔹 5. IAQ Considerations
Fresh Air Inlet: Small fresh air duct with filter.
Exhaust Fan: In kitchen and bathroom.Air Filters: MERV 8–11 filters.
Humidity Control: Use of dehumidifier in monsoon season.
🏢 B. HVAC Design for a Small Office (Commercial)
🔹 1. Assumptions
Area | Size (ft²) | Occupants | Equipment (W) |
---|---|---|---|
Reception | 150 | 2 | 300 |
Work Area | 600 | 6 | 1500 |
Cabin | 150 | 1 | 300 |
Conference | 200 | 6 | 1000 |
🔹 2. Load Calculation (Use Manual N for commercial)
Components:
Area Load: Total 1100 ft² × 35 BTU/hr = 38,500 BTU/hr
People Load: 15 people × 400 BTU/hr = 6,000 BTU/hrEquipment Load: ~3000 BTU/hr
Lighting Load: 1100 ft² × 3 W/ft² × 3.41 = ~11,000 BTU/hr
👉 Total ≈ 58,500 BTU/hr ≈ 4.9 Tons ≈ 5 Ton AC needed
🔹 3. Equipment Selection
Central Ducted Package Unit or VRF/VRV System
Zone | Suggested Unit |
---|---|
Work Area | 2 Ton cassette type |
Conference Room | 1.5 Ton wall mount |
Reception/Cabin | 1.5 Ton combined |
🔹 4. Duct Design Layout
Use ducted central unit with VAVs for zoning.
Air velocity = 1000–1200 FPM for commercial ducts.Duct material: GI sheet metal.
Example Layout:
Supply Vents: Each room
Return Air Duct: Common return to AHUFresh Air Intake: Through treated fresh air (TFA) unit
🔹 5. IAQ Considerations
CO₂ Sensors for occupancy-based ventilation
HEPA or MERV 13 filtersUV Lights in ducts to kill microbes
Fresh Air Ventilation: 15–20 CFM/person
Humidity Control: Maintain RH 40–60%
📐 Summary of Design Parameters
Parameter | Residential (3BHK) | Small Office |
---|---|---|
Cooling Load | 2.5 Tons | 5 Tons |
Equipment Type | Split / Central | VRF / Ducted |
Air Flow Rate | 400 CFM/ton | 400 CFM/ton |
Air Changes | 4–6 per hour | 6–10 per hour |
Fresh Air Required | Basic Ventilation | TFA system |
Filtration | MERV 8–11 | MERV 13+ |
🛠 Final Deliverables
✅ 1. Load Calculation Sheet
✅ 2. Equipment List with Specs
✅ 3. Duct Layout Diagram
✅ 4. IAQ Measures Plan
✅ 5. Energy Efficiency Notes (e.g., inverter AC, insulation, zoning)