1. A Gantt chart provides information about

a. Material handling 

b. Production schedule 

c. Proper utilization of man power 

d. All of the above 

Ans.

2. The extraneous disturbance generated in measuring system which convey no meaningful information with respect to desired signal is called 

a. friction 

b. disturbance 

c. noise 

d. vibration 

Ans.

3. Founder of micro motion study is 

a. Taylor 

b. Fayal 

c. Gilbreth 

d. Mundel 

Ans.

4. In a PERT problem, optimistic time, most likely time & pessimistic time are 1, 2 & 3 respectively, then the expected time is

Ans.

BY Rahul Kothiyal Sir 

6. Gantt charts are used for 

a. Forecasting sales 

b. Production schedule 

c. Scheduling and routing 

d. Linear programming 

Ans.

7. The reasons which are basically responsible for the formation of a queue 

should be that 

a. The average service rate is less than the average arrival rate 

b. Output rate is linearly proportional to input 

c. Output rate is constant and the input 

varies in a random manner 

d. All of the above 

Ans.

8. The performance of a specific task in 

CPM is knows as 

a.

b.

d.

a. Dummy 

b. Event 

c. Activity 

d. Contract 

Ans.

c.

Ans.

5. Work study is concerned with 

a. Improving 

b. Motivation of workers 

c. Improving production capability 

d. All of the above 

9. It is used to group elements into each 

work station so that all the worker in each 

workstation are active about the same 

amount of time. What technique is it

a. Mapping 

b. Flexible manufacturing cell 

c. Scheduling 

Day 1 RRB JE YouTube Practice Session

d. Line balancing 

Ans.

10. What is the method by which the master schedule is adjusted to balance the due dotes of jobs or orders against the capacity of the plant and its individual 

work cells and facilities called as

a. Resource planning 

b. Scheduling 

c. Capacity planning 

d. Integration 

Ans.

11. Usually .................is the initial stage of a component manufacturing

a. Design 

b. Conception 

c. Material selection 

d. Testing 

Ans.

12. Basic tool in work study is

a. Stop watch 

b. Shop layout 

Make 

c. Process chart 

d. Planning chart 

Ans.

13. Standard time is defined as 

a. Normal time + allwance 

b. Normal time + idle time 

c. Normal time + idle time + allowance 

d. None of these 

Ans.

BY Rahul Kothiyal Sir 

14. Work study is mainly aimed at 

a. determining the most efficient method of performing a job 

b. estimating the minimum time of completion of job 

c. developing the standard method and standard time for a job 

d. economizing the motions involved on the part of the work while performing a job 

Ans.

15. The symbol used for transport in work study is 

a.⇒ 

C. 

Ans.

b.

d

Δ 

16. What does symbol imply in work study

a. Operation 

b. Inspection 

c. Transport 

Easy 

d. Permanent storage 

Ans.

17. The work measurement is done by 

means of 

a. Planning chart 

b. Process chart 

c. Gantt chart 

Day 1 RRB JE YouTube Practice Session

d. Stop watch 

Ans.

18. In PERT analysis, the time estimates of activities and probability of their 

occurrences follow as 

a. Normal distribution curve 

b. ẞ distribution curve 

c. Poisson's distribution curve 

d. Binominal distribution curve 

Ans.

19. What does symbol "O" imply in work study

a. Operation 

b. Inspection 

c. Transport 

d. Delay 

Ans.

20. What does "V" imply in work study

a. Operation 

b. Inspection 

c. Delay 

d. Permanent storage 

Ans.

Store 

Lake I 

21. Father of time study was

a. F.W. Taylor 

b. H.L. Gantt 

c. F.B. Gilbreth 

d. R.M. Barness 

Ans.

BY Rahul Kothiyal Sir 

22. The scientific study of the relationship between man and his working environment is known as

a. Industrial psychology 

b. Ergonomics 

c. Industrial engineering 

d. Work study 

Ans.

23. Percent idle time for man and 

machines is found by

a. time study 

b. analytical sampling 

c. analytical estimating 

d. ABC analysis 

Ans.

24. SIMO charts are associated with

a. method study 

b. motion study 

c. process analysis 

d. collection of statistical data 

Ans.

ion of statistical

25. The symbol on a PERT/CPM chart 

represents

a. An ordinary event 

b. A significant event representing some 

milestone 

c. An event to be transferred to other 

network chart 

d. Dangling event 

Day 1 RRB JE YouTube Practice Session

Ans.

26. Work study is concerned with

a. Improving present method and finding standard time 

b. Motivation of workers 

c. Improving production capability 

d. Improving production planning and 

control 

Ans.

27. A certain process has Normal time of 40 min. if the allowances provided are 

10%, then what will be the standard time for the process

a. 44 min 

c. 50 min 

Ans.

b. 40 min 

d. 45 min 

28. What is included in the Work study

a. Only method study

b. Only work measurement 

c. Method study and work measurement 

d. Only micro-motion study 

Ans.

motion studyake 

29. Customers arrive at a reception 

counter at an average interval rate of 10 minutes and receptionist takes an average of 6 minutes for one customer. Determine average queue length

a. 9/10 

b. 7/10 

c. 11/10 

d. 3/10 

Ans.

BY Rahul Kothiyal Sir 

30. When we view processes as 

interconnected components of a system

we tend to avoid

a. root causes 

b. capacity utilization 

c. process variance 

d. sub optimization 

Ans.

31. Percent idle time for men and machine 

is found by 

a. work sampling 

b. time study 

c. method study 

d. work study 

Ans.

32. In a bar chart the vertical axis 

represents 

a. Time 

b. Types of activities 

c. Number of labours 

d. Various activities of the project 

Ans.

33. Gantt charts indicate 

a. Comparison of actual progress with the scheduled progress 

b. Balance of work to be done 

c. Progressive cost of project

d. Inventory costs 

Ans. a

homeacademy

Home academy is JK's First e-learning platform started by Er. Afzal Malik For Competitive examination and Academics K12. We have true desire to serve to society by way of making educational content easy . We are expertise in STEM We conduct workshops in schools Deals with Science Engineering Projects . We also Write Thesis for your Research Work in Physics Chemistry Biology Mechanical engineering Robotics Nanotechnology Material Science Industrial Engineering Spectroscopy Automotive technology ,We write Content For Coaching Centers also infohomeacademy786@gmail.com