production.production planning and control.manufacturing planning and control.production planning control.operations planning and control
(Production, Planning and Control) |
Which of the following is not a method of financial incentive payment? (a) Halsey premium plan (b) Bedaux premium plan (c) Rowan premium plan (d) Jhonson's premium plan |
..............organisation is also called as military organization : (a) Functional (b) Line (c) Line & staff (d) None of the above |
Which is not a part of PDCA cycle (Deming wheel)?
|
(a) Do (b) Check
(c) Plan (d) Approve
For a repairable product, the ratio of the time it is working satisfactorily to..............is called availability |
(a) the total down time (b) the test interval (c) the total up time (d) failure rate |
In a closed loop process control system with PID controller, ............response depends only on the difference between set point and the process variable. (a) proportional (b) integral (c) differential (d) All of these |
............is the tool for organizing the workplace in a clean, efficient and safe manner to enhance productivity and enable standardized working. (a) 5S (b) 3D (c) 6O (d) None of these |
What is data mining used to aid in ? (a) Operational management (b) Analyzing past data to yield information of value in tactical management (c) Detecting patterns in operational data (d) Retrieving achival data |
In order that linear programming techniques provide valid results (a) Relations between factors must be linear (Positive) (b) Relations between factors must be linear (Negative) (c) (a) or (b) (d) None of the above |
Gantt chart provide Information about: (a) Break even point analysis (b) Production schedule (c) Material handling layout (d) Determining selling price |
Ans. (b)
In manufacturing management, the term "Dispatching" is used to describe: (a) Dispatch of sales order (b) Dispatch of factory mail (c) Dispatch of finished product to the user (d) Dispatch of work orders through shop floor |
The simplex method is the basic method for (a) Value analysis (b) Operation research (c) Linear programming (d) Method anlysis |
Quering theory is associated with (a) Sales (b) Inspection time (c) Waiting time (d) Production time |
What is OLAP ? (a) A type of application software designed to report analyze and present data (b) An integrated collection of logically-related records or files consolidated into a common pool that provides data for one or more multiple user (c) An approch to quickly answer multi dimensional analytical queries (d) A class of information system that support business and orgnizational decision-making activities |
What does connecting one computer to another create ? (a) Control unit (b) Track (c) Network (d) Sector |
Which of the following production system is characterised by the low production volume? (a) Project Production System (b) Job Shop Production System (c) Batch Production System (d) Mass Production System |
(a) Machine loading (b) Stores (c) Accounts (d) None of these |
Bin card is maintained by ______. (a) costing department (b) stores department (c) finance department (d) accounting department |
Bin cards placed in : (a) store records (b) stock records (c) (a) and (b) both (d) None of these
|
Re-ordering level is calculated as (a) Maximum consumption rate × Maximum re order period (b) Minimum consumption rate × Minimum re order period (c) Maximum consumption rate × Minimum re order period (d) Minimum consumption rate × Maximum re order period |
Which of the following is true for inventory control? |
(a) Economic order quantity has minimum total cost per order (b) Inventory carrying costs increases with quantity per order (c) Ordering cost decreases with low size (d) All of the above |
Routing is essential in the following type of industry: (a) Assembly industry (b) Process industry (c) Job order industry (d) Mass production industry |
Which one of the following is a process under job evaluation ? (a) Job description (b) Job analysis (c) Job specification (d) All of the above |
40. The full form of ERP is (a) Enterprise Revenue Planning (b) Enterprise Recovery Planning |
(c) Enterprise Report Planning (d) Enterprise Resource Planning |
Any network must have flow between Source and Sink equal to capacity of : (a) Cut (b) Minimum cut (c) Both cut and minimum cut (d) Either cut or minimum cut |
The following activities are to be performed in a particular sequence for routing a product 1. Analysis of the product and breaking it down into components 2. Determination of the lot size 3. Determination of operations and processing time requirement 4. Taking makes or buys decisions |
The correct sequence of these activities is
| (a) 1, 2, 3, 4 (b) 3, 1, 2, 4 (c) 3, 1, 4, 2 (d) 1, 4, 3, 2
|
Dispatching function of production planning and control refers to: (a) A dispatch of finished goods on order (b) Movement of in-process material from shop to shop (c) Authorizing a production work order to be launched (d) Dispatch of bills and invoices to the customer
|
In a low volume production, the dispatching function is not concerned with issuing of which one of the following? (a) Work tickets (b) Requisition of raw materials, parts and components (c) Route sheets to production supervisor (d) Requisition of tools and facilities |
Routing assists engineers in deciding in advance
(a) the flow of material in the plant (b) the methods of proper utilization of manpower |
(c) the methods of proper utilization of machines (d) the layout of factory facilities |
|